
Working after a delivery day. I put in 8h today, moving constantly stocking produce, and once home after a snack and some sit down screentime, figured I would grout.
Granted, it’s a small project, but there was time, and enough motivation to nail it. This allows the project to move into the vertical phase.
The tiling isn’t as level as I was shooting for (my old thin set was chunky and posed some resistance to level application, tile placement) and the tile spacing isn’t perfect, but it’s welcome progress and the little things won’t be noticeable, off putting.