
Steps dovetail with others. The flashing (and layer of insulation) is tacked up, about halfway around. I don’t love the look, but it’s an invitation to build the beds! (the growing medium lays up against the steel instead of the wood)

I’m stopping near north to decide about pond installation. There are a series of blocks attached to the rear foundation walls to support the pond and it’s oval shape. Trying not to get ahead of myself.
A week of dry, cool breezes will help dry things out, facilitate the last bit of sealing. (The vents are notoriously leaky)