
The doorway (aka snowshed) is rather involved. I’m affixing some glazing to lock the frame into place. It’s going well, slow and careful work.

I’m leaving lots of the protective film on as I’m hardly done with the panels, fasteners. I’ll be able to move around on the surface of the dome tomorrow, with clean clothes and shoes!!