
The 15 sections of the foundation wall have 2 coats of deck stain and roof goo (the latter on the bottom, face up here to cure) and caulk at all inside seams. (I had some exterior siding caulk laying about that will help decrease nooks and crannies things could attach to and live on.)
I’m shifting to packing mode, I’ll be gone a week and a half. I’m eager to finalize leveling the foundation and assemble the foundation wall.
All bulbs are in, show you the beds later!!