The project shuffle

The painting station has moved.

The bricks on the windowsill are new, a eureka moment for sure. I could be drying out the bricks for use (even though the stove project has been pushed to late summer/fall), move them from their current staged location sorta in the way., as well as have more thermal mass in the Borch.

Most of the kit has a home under cover, but there are already A LOT of triangles around the property. It’s the project shuffle!

Triangle sanding tomorrow, the back of the line needs to advance. Then a prime to push it another notch

Leave a comment