
The new pressure tank is much simpler in design, all metal. It has a different connection though. I found something that fits over it it and began the process of connection, when I realized it will fit right into the connector thingy! Huzzah.
Heard two of the worst things about freight this morning. “Heavy and Late.” Curiously, 800 pieces never arrived at the station so a relatively normal Wednesday after all. Those missing pieces will make Thursday heavy, but better to spread it out.
I’m not doing lots of plumbing tonight, but since I just realized the simplicity of the connection, I’ll test the system and see what comes up (or out…)