From

The bathroom that never happened (upstairs where the bed now resides)

The copper that runs to it

Where the cold came into the OG water heater/furnace (the original source of heat for the radiant floor system was a massive propane water heater that transitioned to the plant for Deedle’s place on Sterling Street) and the hot came out.

Yes, it’s hard to believe I once had running water, both hot and cold. There was an interruption in service, this new school elbow is gonna make it happen again.

I don’t want to solder that close to the wall material! The old copper from the bathroom and boiler are coming down, getting repurposed. Free material, and it will clean up a few corners. Stay tuned for sink details!!

Leave a comment